Case Study
Oceaneering completes world's first remote metrology project
Connecting What’s Needed with What’s Next TM oceaneering.com Case Study Project Overview A major customer in the deepwater Gulf of Mexico was interested in expanding on the Oceaneering-provided remotely operated survey (ROS) services being used on its drilling rigs. The customer had a number of well jumper metrologies scheduled to be performed from the drilling rig, and inquired about the feasibility of performing these metrologies remotely. In working with the customer, two test metrologies were first performed on two jumpers before performing a successful remote metrology on the jumper in question. The remotely operated metrology solution Oceaneering developed and deployed provided the customer with the data required and resulted in substantial cost savings. Oceaneering