Case Study

Maritime Link anchor installation

Maritime Link anchor installation

Pages 2 Pages

The project Emera hired Rokstad Power to erect a transmission line from Stephenville to Cape Ray, Newfoundland to complete the power circuit from Labrador to Nova Scotia. The locations of the transmission towers required four grouted anchors at each one. The challenge Because of poor ground conditions, installing the anchors was a challenge, as was access to each tower location. In some cases the crew could not move o the working platform, comprising crane mats, due to areas of bog. With extremely cold weather and high winds, the crew also faced icy trails and frozen equipment daily. Maritime Link anchor installationThe solution Keller worked alongside two other companies to expedite the drilling process and complete it safely. Multiple trails were provided along the Trans-Canada Highway