Suncor Pond 5

Pages 3 Pages

The project Suncor’s Pond 5 in Alberta is approximately 1.6 x 2.5km in area and 40m deep and lled with uid-like clay tailings or mine dumps. Mine regulators in Alberta required construction of a permanent cap on the pond and reclamation of the land. A solution was needed to dewater the ne tailings and increase their shear strength to allow for construction of the cap. The challenge Suncor Pond 5Northern Alberta is a remote location with harsh winter working conditions. Consisting of a oating cover over uid low-strength tailings, the working platform also presented equipment and personnel safety issues. The solution Hayward Baker developed equipment and procedures to enable the safe installation of the drainage system. We safely and e ciently installed 6.2 million linear metres of wic

Join for free to read