The project In late 2011, Chevron Australia began construction of the $29 billion Wheatstone Project, located 12km west of Onslow on the Pilbara coast of Western Australia. The contract for foundations included procurement, installation, testing and trimming of more than 25,000 driven steel tube piles (355mm diameter to 610mm diameter) over the course of a rigorous 16 month programme. The challenge Large quantities of steel tube had to be imported, transported, stored, delivered and installed at a very remote location. The sheer magnitude Chevron Wheatstone projectof the works required a high number of personnel on the job, a great deal of equipment and expert coordination. The solution Keller implemented a digital system to manage steel tube logistics, invoicing, quality, and installation