Case Study
Madani High School, Leicester
Wessex ModuMax boilers are providing the perfect back up for a biomass boiler at Madani High School in Leicester. This multi-award winning project caters for around 600 pupils and has been open since September 2007. The two Wessex ModuMax boilers were designed and installed by Robert Prettie and Co Limited, to the performance speci cation set out by Pick Everard’s building services engineer, Philip Johnson, to integrate with the biomass boiler selected for the project. He commented, “We can always depend on Wessex ModuMax boilers because they integrate really well with the chosen biomass boilers. They also t into a small space and deliver great e ciency.” “Space was tight in the plant room but Wessex ModuMax boilers can cope with the base load for the school with ease: The choice was ea