Case Study
Canford School, Dorset
The work was carried out as part of a planned upgrade for one of Canford School’s 24 plant rooms. Wessex Building Services, a mechanical and electrical contractor also based in Dorset, replaced four Hamworthy Purewell Classic atmospheric boilers with three Purewell VariHeat pre mix condensing modular boilers, plus provision for a fourth in the summer when that area of the school is likely to be extended. The three Purewell VariHeat 70kW condensing boilers and a Powerstock PS300 high performance calori er are providing the heating and hot water for the school’s biology block. With 635 pupils attending Canford school, the system is very much in demand during term time. Purewell VariHeat boilers are commonly used in refurbishments projects because they have a greater tolerance of older heatin