Case Study
Laguna Honda Hospital Replacement
Laguna Honda Hospital Replacement Overview The Laguna Honda Hospital Replacement Project consisted of two phases: Existing Hospital Remodel/Demolition and New Hospital Construction. The new construction phase of the project included four new residential buildings: two seven-story towers, one six-story tower with a 1,500 sf server room, and one four-story building that links the towers together. The project also called for arenovation of the existing hospital. (Photograph: David Wakely) TEECOM’s Contribution Although TEECOM was brought into the project much later than the rest of the design team, we took this 1,100,000 sf project from programming through 100% construction documents in less than eight months. TEECOM was able to come up with innovative solutions to make the structured cabling