Case Study

Investigating the Performance of RAPID CHILL in a Comfort Cooling Application - 54 Floor Storey Tower, Dubai UAE

Investigating the Performance of RAPID CHILL in a Comfort Cooling Application - 54 Floor Storey Tower, Dubai UAE

RAPID CHILLTM 54 Floor Storey Tower, Dubai UAE, Provisional Report 1 www.RaiseEnergySolutions.com info@RaiseEnergySolutions.com | +1 678.331.5548 Investigating the Performance of RAPID CHILLTM in a Comfort Cooling Application 54 Floor Storey Tower, Dubai UAE 148 days compared before/after using chosen before/after methodology 19.01% saving compared to baseline. $73,087 USD saved. 1,016,000kg CO 2 e saved IntR oDuC tIon The performance of RAPID CHILLTM was piloted by Blue/Integrated in a 54-storey mixed-use tower on Sheikh Zayed Road in Dubai’s Central Business District. The building comprises of offices, hotel apartments and residential units. The project is connected to Tabreed District Energy. The primary load of the building is comfort cooling which requires constant

Join for free to read