Case Study

HM Prison Leeds

HM Prison Leeds

Pages 1 Pages

CASE STUDY HM PRISON LEEDS HEADLINES KEY FACTS Project title: HM Prison Leeds Location: Armley Services: Solar PV system analysis, design, supply and installation Client: Ministry of Justice Contractor: TClarke G&H divisions: Renewables design features saw flashing installed around panels and fitted flat to the roof of energy saved annually and deliveries programmed in at specific times and coordinated with HM Prison Leeds HIGH WORK SPECIAL 20,700KWH security prison presented logistical challenges HOW WE DID IT We were appointed to design, supply and install a 126 sqm solar PV array as part of the refurbishment programme of this 19th century Leeds prison being managed by contractor TClarke. The high security nature of HM Prison Leeds made it a challenging scheme logisti

Join for free to read