Guelb Moghrein Copper Gold Project
Create Build Operate The redevelopment of the Guelb Moghrein facility at a throughput of 2.0 Mt/a treating sulphide ore, was completed in 2006 utilising flotation and Carbon-In-Leach (CIL). Sedgman was engaged to provide the detailed engineering, procurement, construction. Work also included re-equipping the borefield and a new 113 km water pipeline. In 2009, the plant was successfully commissioned following upgrading to a throughput of 3.87