Case Study
Boseto Copper Project
Create Build Operate Sedgman delivered a fast-tracked, low fixed cost solution which maximises the resource for our client. This required Front End Engineering Design (FEED) and metallurgical testing, followed by detailed engineering design, procurement and construction (EPC) and commissioning, delivered under a lump sum turnkey contract arrangement. The plant processes 3 Mt/a of ore consisting of three-stage crushing, ball milling, separate