Case Study

Mungari Gold Project

Mungari Gold Project

Pages 1 Pages

Create Build Operate Sedgman had successfully delivered pre and definitive feasibility studies and front end engineering design phases of the project in 2012. The plant is designed to process a blend of ores from the Frog’s Leg and White Foil mines to produce a gold doré product. Efficient plant design has enabled a cost effective processing solution while maintaining high levels of reliability, operability and maintainability. The proven CIL

Join for free to read