Case Study
Mungari Gold Project
Create Build Operate Sedgman had successfully delivered pre and definitive feasibility studies and front end engineering design phases of the project in 2012. The plant is designed to process a blend of ores from the Frog’s Leg and White Foil mines to produce a gold doré product. Efficient plant design has enabled a cost effective processing solution while maintaining high levels of reliability, operability and maintainability. The proven CIL