Case Study
Frimley Park
Frimley Park Hospital reduces call response times despite increasing call volumes The Challenge A growing population and some large housing developments planned in the vicinity, required Frimley Park Hospital to meet increasing call volumes. The Trust’s new call answering target was 90% of calls to be answered within 20 seconds. Although the existing manual switchboard had a very good reputation, it became clear that the Trust needed an ad