Case Study

EXCAVATING OPERATIONS

EXCAVATING OPERATIONS

The challenge here was to perform excavating operations at a Mississippi Nuclear Plant with zero line strikes for the duration of the project. Before work could begin each of our crewmembers had to go through an extensive background check. Procedures were far above and beyond our normal rigorous security. Clearance on our people and equipment took a month. The plant was in growth mode, and had some equipment installations scheduled. We com

Join for free to read