Case Study
E-MTrak Delivers Real-Time MWD Data During Flow-Off at 12,890 ft Depth
Benefits ? Drilled successfully to target depth of 12,890 ft ? Transmitted real-time MWD data successfully even during connections, saving approximately 11 hours of rig time Background ? Hinton, Alberta, Canada ? May 2008 ? 8¾-in., 7-in. and 6½-in. sections of an S-type gas development well ? Precisely place the wellbore even when drilling with high concentrations of lost circulation material (LCM) ? Transmit real-time data during