Case Study
E-MTrak Electromagnetic MWD Service Successfully Transmits Data at 14,000 ft TD
Benefits ? Transmitted data up-hole, during 15 runs, for over 942 hours ? Successfully reached target depth of 14,000 ft Background ? Oklahoma, USA ? July 2006 ? 8¾-in. vertical gas development well in highly dipped formation ? Minimize non-productive time (NPT) Baker Hughes Solution The E-MTrak ™ electromagnetic MWD system provides real-time directional, gamma, vibration, stick-slip and pressure measurements. Southern Oklah