Case Study
Clinker Silo Foundations - Guatemala
Clinker Silo Foundations Guatemala Year of Completion: 2006 Construction Cost: $600,000 Client: ABS Consulting Services Performed: • Conceptual Design • Detailed Design • Foundation Design • Non-Linear Soil-Pile Interaction • Slurry W alls • Secant Piling • Large-Diameter Piles • Seismic Design Site location for Clinker Silo foundations. Ben C. Gerwick, Inc. 08-185e The 54,000 metric ton capacity clinker storage silo was buil