Case Study
Gerwick,
New Carquinez Bridge: Foundation Design Crockett, California Year of Completion: 1993 Construction Cost: $100M Client: Caltrans Services Performed: • Foundation Design • Seismic Analyses • Construction Engineering Ben C. Gerwick, Inc. 01-058e Under the lead of JMI International, Gerwick provided preliminary engineering services for the foundations of several cable-stayed alternatives. To provide additional traffic capacity crossing t