Case Study
Busan-Geoje Immersed Tunnel - South Korea
Busan-Geoje Immersed Tunnel South Korea Year of Completion: 2010 Construction Cost: $300M Client: Daewoo Engineering & Construction Co. Ltd. Services Performed: • Seismic Design • Structural Design Busan-Geoje Tunnel. Ben C. Gerwick, Inc. 04-217e The two-mile long Busan-Geoje immersed tunnel is being constructed as part of a five-mile, four-lane fixed link highway. The tunnel will be one of the longest in the world, and with