Case Study

Building Endstate Strategy Project - PNGS

Building Endstate Strategy Project - PNGS

Pages 2 Pages

Building Endstate Strategy Project - PNGS The main purpose of the project was to conduct a technical assessment of OPG’s proposed building strategy for PNGS to maintain the plant for a long-term storage with surveillance period of approximately 30 years. Scope of Work Validate the proposed strategy using relevant codes, standards and operating experience; Understand the minimum inspection, monitoring and maintenance requirements for buildings during Safe Storage so that structures can be maintained safe to enter and able to withstand any future dismantling and demolition work being performed; Minimize any new hazards that might arise during building lay-up (e.g. as a result of corrosion or biological infestation); and Identify any reasonably foreseeable complications that might arise durin

Join for free to read