Scope of the Works Dyer & Butler delivered enabling works for the construction of Terminal 2 Concourse B North as a key sub-contractor to the Principal Contractor. The works comprised construction of the substructure elements (foundations and ground floor slab) and concrete infill to pre- cast concrete planks and composite slabs to the superstructure. The Eastern Apron at Heathrow Airport was reconfigured into a rectilinear co