Installation of sheet piles and gabion basket retaining wall at the site of a deep seated rotational slip. The works included stabilisation of the failed existing temporary works, protection of HV cables in troughing units along the front of the retaining wall, installation of sheet piling, excavation of the failed section of existing brickwork retaining wall, installation of gabion basket retaining wall, re-grading of the existing embankm