Case Study

GASHCO

GASHCO

Pages 2 Pages

Scope of the Works The scope of the work covers the installation of 3 no new Class 1 full retention interceptors, (Condor Environmental Solutions CNS200s-7.53X4M diameter) together with modifications to the existing surface water and foul water drainage pipe work along with the upgrade of the bund sump pump discharge system. The work comprised the following: Earthworks excavati

Join for free to read