Case Study

Yuasa Batteries UK

Yuasa Batteries UK

Pages 2 Pages

Yuasa Batteries UK Energy consumption per product (Specific Energy Consumption) reduced by 42% The Client Yuasa is one of the world’s largest manufacturers and suppliers of lead-acid batteries with global manufacturing plants and an extensive marketing and distribution network throughout the UK and Europe. The Brief In 2006, RUMM was invited to implement its energy management scheme at Yuasa’s Ebbw Vale plant which employs over 300 people. The Plan RUMM installed a total of 35 electricity, gas, water and steam meters in operation, RUMM implemented changes to the compressor and extraction systems, along with a site switch-off procedure. These measures, in particular helped to dramatically reduce base load and non- production energy consumption, and meant that tangible results were seen in j

Join for free to read