Case Study
Zodiac Group
Zodiac Group Gas costs reduced by 48% through improved procurement The Client Zodiac Aerospace design and manufacture premium seating and cabin interior products for major airlines. The company have two UK sites – one manufacturing site in Cwmbran, South Wales and a registered office, manufacturing, maintenance and repair centre in Camberley, Surrey. The repair centre has capability for the renovation of a wide range of equipment, including seats, lavatory modules, galleys, galley insert equipment, leather refurbishment, linings and feature furniture. The Brief The company required a specialist consultancy to help develop their energy strategy in order to reduce energy consumption and increase savings, both through improved energy procurement and energy analysis to identify and attack area