Case Study

WTW Reedbed

WTW Reedbed

Case Study : Godshill WTW Reed Beds Client: Southern Water Contractor: BTU (Barhale Trant Utilities) Value: £38,000.00 Date: 2014 AquaticEngineering were appointed by BTU in early 2014 to undertake consultancy reports on a number of sites throughout the south of England which initially included a reed bed refurbishment on an Isle of Wight WTW owned by Southern Water. The 400m 2 horizontal flow gravel reedbed had

Join for free to read