Case Study

Royal Parks Lakes

Royal Parks Lakes

Case Study : Dredging and Reedbed Creation on 3 Royal Park Sites Client: Royal Parks Duration: 2009 - 2012 The consultants and staff of AquaticEngineering have been directly involved and contracted by the Royal Parks over a 4yr period to undertake the dredging and reedbed creation on the lakes of three of the capitals favourite Parks – Serpentine / Hyde Park – Kensington Long Water / Kensington Gardens – Queen Mary Gar

Join for free to read