Case Study
Works consisted of validation surveys to all the existing toilet ventilation systems, main plant and distribution services
Works consisted of validation surveys to all the existing toilet ventilation systems, main plant and distribution services
CASE STUDY Client: Royal Albert Hall Contractor: Loop Engineering Nature of client end user business: The Royal Albert Hall is a concert hall on the northern edge of South Kensington, London, which holds the Proms concerts annually each summer since 1941. It has a capacity of up to 5,272 seats. Project Location: London Scope of job: As part of a 2 year project, the next phase of the Grade I listed building’s development is an underground expansion project on the west side of the building. Timing: February to April 2017 What the project entailed: Works consisted of validation surveys to all the existing toilet ventilation systems, main plant and distribution services along with investigative works to fire dampers and bms interfacing. Tracing of ductwork through existing solid ceili