Case Study

Following Detailed Surveys Of Existing Systems

Following Detailed Surveys Of Existing Systems

Greenside Way, Middleton, Manchester M24 1SW T: +44 (0)161 655 3344 F: +44 (0)161 655 3399 W: www.besltd.org Part of the Boulting Group Ltd DESIGN CASE STUDY NO 10 Operational Improvement Study ? Surveys and investigations ? Cat 2/3 Facility – Complex Pressures ? Commissioning Study ? Energy Consultation ? ? Following detailed surveys of existing systems and a rigorous design and commissioning r

Join for free to read