Case Study

This project consisted of pre-flushing, chemical cleaning and dynamic flushing of lthw & hthw systems (operating at 136oC) to BSRIA BG29 standards

This project consisted of pre-flushing, chemical cleaning and dynamic flushing of lthw & hthw systems (operating at 136oC) to BSRIA BG29 standards

CASE STUDY Client: RAF Lakenheath - Building 1220 Contractor: Eyre Building Services Nature of client end user business: Royal Air Force station Royal Air Force Lakenheath, United Kingdom, is located 70 miles northeast of London and 25 miles northeast of Cambridge. The Liberty Wing consists of more than 4,500 active-duty mili - tary members, over 1,000 British and U.S. civilians and includes a geographically-separated unit at nearby RAF Feltwell. RAF Lak- enheath is the largest U.S. Air Force-operated base in England and the only U.S. Air Forces in Europe (USAFE) F-15 fighter wing. Loc a tion: Brandon, Suffolk Scope of job: This project consisted of pre-flushing, chemical cleaning and dy - namic flushing of (lthw) low temperature hot water and (hthw) high temperature hot water system

Join for free to read