Vollers Excavating Needed To Pinpoint A Complex Leak On A 12” Steel Chilled Waterline Without Incurring Significant Excavation Costs.

Vollers Excavating Needed To Pinpoint A Complex Leak On A 12” Steel Chilled Waterline Without Incurring Significant Excavation Costs.

Chilled Waterline, Below Grade VOLLERS EXCAVATING & CONSTRUCTION CASE STUDY VOLLERS EXCAVATING & CONSTRUCTION NEEDED TO PINPOINT A COMPLEX LEAK ON A 12” STEEL CHILLED WATERLINE BURIED 10 FEET UNDERGROUND, WITHOUT INCURRING SIGNIFICANT EXCAVATION COSTS. 12” InvestigatorTM Steel Overview Pipeline Inspection, condition assessment, leak detection Vollers Excavating & Construction, NJ The Challenge Vollers Excavating & Construction company was working at an industrial property in New Jersey to verify the location of a leak on a 12” steel chilled waterline that was buried 10 feet underground. The piping network at the suspected leak location was connected to a 90-degree offset, then dropped approximately 20 feet vertically before connecting to another 90-degree offset. This allo

Join for free to read