Case Study

Volker Fitzpatrick

Volker Fitzpatrick

Pages 3 Pages

www.rjpowergroup.com RJ Power Group, fully risk assessed, provided design input and then installed, tested and commissioned the ETE and EPB requirements at the depot which included: Installation of 48No Track Isolation Switches (TIS) Installation of 15,500m of 1000mm Positive Traction Cable Installation of 6,000m of 800mm Negative Traction Cable Installation of 2500m of 25mm Traction Cable Installation of 8500m of Multi Core EPB

Join for free to read