www.rjpowergroup.com The works for UKPN within the new Williams Way Substation entailed: Installation and Termination of HV Feeders cables F3007,F3008 and F3111 Installation and Termination of HV cables to new Auxiliary Transformers Installation and Termination of DC Positive Track cables between DC Rectifiers and DC switch gear. Installation and Termination of DC Positive Track Interconnector cables Installation and Terminati