In 2015 CWE Ltd looked to diversify into Rail Infructure. The resulting project with Unipart Rail and Volker Rail was a major step forward in this area for CWE. The stantions, bridges and associated steelwork were made in the fabrication shop at Crowle and then delivered to site. CWE personnel travelled to the site to observe the end project managed by the Staffordshire Rail Alliance. All steelwork was delivered on time and to specification. • CROWLE WHARF ENGINEERS LTD • CROWLE WHARF ENGINEERS LTD • CROWLE WHARF ENGINEERS LTD • CROWLE WHARF ENGINEERS LTD • CASE STUDY +44 (0)1724 710 455 WWW.CWELIMITED.COM Case Study - Overhead Line Equipment (OLE)