Using PermaCare MPE50 helped the plant to operate twice as long, extend the intervals between cleanings, and substantially reduce the foam.

Using PermaCare MPE50 helped the plant to operate twice as long, extend the intervals between cleanings, and substantially reduce the foam.

Pages 3 Pages

Case Study CH-599 MBR plant subject to tidal ingress of seawater improves performance using PermaCare ® MPE50 ™ In this study, PermaCare MPE50 pro- vided the following results: • Allowed the plant to operate for up to twice as long before significant decline in permeability was observed. • Extended the intervals between cleanings by about 20-100%. This extended cleaning interval, which minimizes the plant downtime and thus helps maintain the pla