Case Study
TYLI provided A/E study and design services for multiple renovation and energy projects at the Charles George Veterans Affairs (VA) Medical Center
TYLI provided A/E study and design services for multiple renovation and energy projects at the Charles George Veterans Affairs (VA) Medical Center
Project Highlights: T. Y . Lin International (TYLI) provided Architectural/Engineering (A/E) study and design services for multiple renovation and energy projects at the Charles George Veterans Affairs (VA) Medical Center in Asheville, North Carolina. All project work was contracted by the U.S. Department of Veterans Affairs. Heating, ventilation, and air conditioning (HVAC) systems Building renovation Campus water tower Light occupancy sensors New geothermal system Boiler plant condensate return system Energy deficiency corrections to reduce the energy usage by over 30% in order to be within federal mandates UPGRADE HVAC SYSTEM, PHASE 3 This project replaced two large air handling units, including investigations toidentify which portions of the systems needed replacement based on age, con