Case Study

Veterans Affairs

Veterans Affairs

Pages 1 Pages

Veterans Affairs Energy Conservation Measures Implementation EXPERIENCE - VA ECM IMPLEMENTATION PROJECT DESCRIPTION DHW Systems Upgrade The design for the existing laundry wastewater recovery system was replaced in its entirety to provide a more efficient system consisting of a new insulated wastewater storage tank, circulation pumps, controls and double wall exchanger. All controls for the new system directly interface with the

Join for free to read