Case Study
Treatment Change of Pace
Location: Pace, Florida Owner: Pace Water System, Inc. Engineer: Baskerville-Donovan, Inc. Contractor: J&P Construction Co., Inc. Master Plan Pace Water System, Inc. provides wastewater treatment for residents in and around Santa Rosa County, Florida. The current treatment plant began operating in 1993 with a design flow rate of 2.0 MGD. To keep up the with projected growth, Pace Water initiated a 3 MGD expansion of the wastewater treatment