Case Study
Plant for Tertiary Treatment
CASE STUDY Franklin, GA – T ertiary Filter 0.75 MGD Peak Flow T reatment System Operation Since September 2010 A new wastewater treatment plant with an average daily flow (ADF) of 0.25 MGD was constructed in 2010 for the Heard County Water Authority to replace its existing plant. In order for this facility to meet the county’ s growing needs, the new facility had to meet several criteria: • Deliver high-quality effluent. • Be simple to ope