Transmission Refurbishment Works Eve worked alongside the Energy Alliance throughout 2014 on a major refurbishment project to transmission towers all over North Wales.Customer Name Energy Alliance Project Location Trawsfyndd to Treuddyn ZK Route, North WalesProducts Used TuffTrak, K Trakpanels, Box Trakpanels, Hybrid Panels, Vehicle Bridges, Pedestrian Bridges Duration March 2014 - December 2014 A challenging project over multiple locations The project was a huge logistical challenge for Eve’s site operations team, as the various towers were located in some of the most challenging environments within the UK. During the planning phase, the project team had to develop plans to work across farmland, peat, mountain terrain, and land owned by the Forestry Commission, each with their own challen