M56 Bridge Replacement Works

Pages 5 Pages

M56 Bridge Replacement Works Eve has been involved in undertaking major projects within the Infrastructure sector since the company’s inception, and the contract to move a 2,000 tonne bridge along the M56 ranks as one of the most impressive.Location Manchester Customer Name Balfour Beatty Products Used Hybrid Panels The contract, for Balfour Beatty, involved Eve’s trakway panels being used to protect part of the M56 motorway, enabling the movement of a large section of a bridge which will ultimately form part of the HS2 route. The hugely impressive move represents the largest single load to go over Eve’s trakway in its 50 year history! Eve was contracted to install 700 aluminium hybrid panels, at various points along the M56 and at the finishing position to be utilised as a large pad to su