Case Study

Town of Winchendon

Town of Winchendon

Pages 2 Pages

INFRASTRUCTURE IMPROVEMENTS PROJECT Winchendon, Massachusetts Apr 29 2011:Case Studies:1717.doc – 2/13/09 Client Town of Winchendon Description Tighe & Bond was retained to provide design and construction services for the reconstruction of Juniper Street (2005), Green and Munroe Streets (2006), and Mechanic Street (2007). The projects include full reconstruction of the roadways including the installation of new 8-inch ductile iron

Join for free to read