Case Study

Tiered Pump Solution Keeps Oil Drain Project on Schedule

Tiered Pump Solution Keeps Oil Drain Project on Schedule

Pages 1 Pages

The Northwest Oil Drain, a nine-mile sewage canal located between a sewer treatment plant and the Great Salt Lake, is responsible for the effluent flow of the city’s primary wastewater treatment plant, as well as the process water from the area’s six petroleum refineries. Because of its location, the canal is prone to hazardous levels of chemicals. For this reason, an EPA-mandated cleaning and remediation process takes place annually. Sunbe

Join for free to read