Fast Rebabbitting Response Keeps Drydocking On Schedule

Fast Rebabbitting Response Keeps Drydocking On Schedule

Pages 1 Pages

            GOLTENS WORLDWIDE SERVICES PROJECT FACTS: STERN TUBE BEARINGS Tonnage: 298,555 DWT Shaft dimension: OD: 741.00mm × L: 1630.00mm Year Built: 2003 FAST REBABBITTING RESPONSE KEEPS DRYDOCKING ON SCHEDULE FORWARD AND AFT STERN TUBE BEARING REBABBITTING & MACHINING During a drydocking period for a Crude Oil Tanker, babbitt material was found when the tail shaft was removed f