85 MGD Sewer Bypass Keeps CIPP Project on Schedule

85 MGD Sewer Bypass Keeps CIPP Project on Schedule

Pages 2 Pages

85 MGD Sewer Bypass Keeps CIPP Project on Schedule PUMPS • TANKS • FILTRATION • PIPE • SPILLGUARDS 800 742 7246 rainforrent.com BACKGROUND Nearly one mile of 84-96” sewer line needed to be re-lined via CIPP method in a densely populated residential area. In order to perform this work, a large, high capacity bypass would be required. PROJECT SCOPE City required 85 MGD bypass system in order to perform CIPP project on 4,100’ of 84-96” pipeline within a high density residential area. CLIENT Municipality and CIPP Contractor INDUSTRY SEGMENT Municipal/Construction EQUIPMENT • 7 - DV400 18” pumps • 7 - E-CONTAIN ® Spillguards • 15,000’ - 18” and 24” HDPE pipe, with fittings ® ® 022018 Six 18” pumps created a temporary pump station to bypass the sewer-flow through four 24”HDPE lines