CASE STUDY HPIDC.COM | PERFORMANCE@HPIDC.COM | +1(832)782-6800 HELMERICH & PAYNE Promoting Continuous Improvement by Increasing Adherence to Slip to Slip Connection Processes OBJECTIVE The start up costs associated with bringing a rig out can be painful with significant amounts of invisible lost time. One operator was proactive in addressing these issues and requested H&P to provide a solution for setting them up for maximum success. The goal was to establish early-on consistency and time savings across crews. H&P recommended FlexConnectTM as a way to provide each driller with real-time slip to slip performance data and encourage uniformity through the observation of standardized processes. Access to this data on the driller’s Human Machine Interface (HMI) shortens the lea