Case Study
The luxury town-house. The 7 storey requirement. The complete high pressure system. We rise to it.
The luxury town-house. The 7 storey requirement. The complete high pressure system. We rise to it. CASE STUDY: PHILLIMORE GARDENS, KENSINGTON TO FIND OUT MORE ABOUT OUR CASE STUDIES VISIT: dutypoint.com/casestudies PROJECT SUMMARY As part of an extensive refurbishment of a large town-house in Kensington, high pressure water was required over seven floors with seven bathrooms, a swimming pool, multiple showers and a 12m deep basement development. PROJECT CHALLENGE After a full site survey, Dutypoint provided a complete tailored packaged solution incorporating a ScubaTANK all-in-one tank and pump booster, a 6.0 bar Element ultra-high performance cylinder, two boilers, pressurisation set, heating pumps and plate heat exchanger. PROJECT SOLUTION The install was a success a