PROJECT SUMMARY Formally known as the Old Fish Processing Factory at London Fields, the scheme consists of a newly refurbished six storey building including 31 residential apartments and 25,000 sq. ft of commercial space. Dutypoint were engaged on this project to design and supply the rain water harvesting system to collect rainwater from the roof and pump grey water to the toilets in the building. PROJECT CHALLENGE Dutypoint were brought onto the project very late in the programme, with the demolition phase already complete and the refurbishment work well underway. The contractor required immediate installation to minimise disruption and reduce any downtime to keep the project on track. Our team worked with the main contractor, project manager, structural engineer, M&E engineers a