Case Study
The historic building. The restricted space. The complete high pressure system. We rise to it.
The historic building. The restricted space. The complete high pressure system. We rise to it. CASE STUDY: DE VERE BEAUMONT ESTATE, WINDSOR PROJECT SUMMARY As part of a multimillion pound refurbishment and extension to the exclusive De Vere Beaumont Estate hotel, Windsor. Dutypoint were selected to provide a high capacity water storage and pump solution to accommodate a significant increase in demand from additional bedrooms to the hotel. PROJECT CHALLENGE Dutypoint worked closely with Cudd Bentley Consulting to design a system specifically for the project which was compact enough to be crane lifted over the historic building and installed in an enclosed courtyard location with minimal impact on the aesthetics of the building. PROJECT SOLUTION The QuadraTANK integrated kiosk,