Case Study
The Fulbridge Academy save on heating with HeatingSave
The Fulbridge Academy save on heating with HeatingSave The Fulbridge Academy is a large primary school in New England, Peterborough. It hosts just over 100 members of staff and approximately 640 pupils. It is in the largest 20% of Primary School’s nationally and is the largest in the Local Authority. The school originally opened in 1935 and serves one of the oldest parts of the city. It was centrally heated right from the start, and, at the time, the hot water pipes were in the cloakrooms so that the children’s coats would dry out during the day if it had been raining. Extra corridors and classrooms were constructed in 1949 and again in 1960. The school’s premises have continued expand slowly over the years. In 2011, the school’s board and the Local Council were reviewing the ever increasi